EasyManua.ls Logo

Quantum DXi6900

Quantum DXi6900
82 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing the DXi6900 System in the Rack
Quantum DXi6900 Installation Guide 42
a. Connect port RBOD1 (slot 2) on the Node to SAS port Ch 1 (Controller A) on RBOD 1.
b. Connect port RBOD1 (slot 3) on the Node to SAS port Ch 1 (Controller B) on RBOD 1.
c. Connect port RBOD2 (slot 2) on the Node to SAS port Ch 1 (Controller A) on RBOD 2.
d. Connect port RBOD2 (slot 3) on the Node to SAS port Ch 1 (Controller B) on RBOD 2.
Figure 30: DXi6900 G2 SAS Cabling (Node to RBODs)
Port 1
Port 2
ID/
Diag
|O|O|
Port 1
Port 2
ID/
Diag
|O|O|
Port 1
Port 2
ID/
Diag
|O|O|
Port 1
Port 2
ID/
Diag
|O|O|
System Node
RBOD 1
RBOD 2
1A 1B
2A
2B
1A 2A
1B 2B
2. Connect each Array module (RBOD) to its corresponding Expansion module (EBOD) using the
provided 2m mini-SAS HD to mini-SAS cables (see Figure 31 on the next page).
a. Connect SAS expansion port 1 (Controller A) on RBOD 1 to SAS port 1 (Controller A) on EBOD
1-1.
b. Connect SAS expansion port 1 (Controller B) on RBOD 1 to SAS port 1 (Controller B) on EBOD
1-1.
c. Connect SAS expansion port 1 (Controller A) on RBOD 2 to SAS port 1 (Controller A) on EBOD
2-1.
d. Connect SAS expansion port 1 (Controller B) on RBOD 2 to SAS port 1 (Controller B) on EBOD
2-1.

Other manuals for Quantum DXi6900

Related product manuals