EasyManua.ls Logo

Rain Bird WP 2 - Test of All Stations; Station Test Procedure

Rain Bird WP 2
18 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
30
To stop watering before the cycle is completed, press the key. The controller will revert to
the controller status screen.
2.6/ Test of all stations
This function tests all the stations connected to the controller using
a 2-minutes cycle and allows you to check that your irrigation
system is working properly.
Then press the
key to start the cycle test.
To move to the next station before the watering time of the previous
station is completed press the
key.
During the test period, « TEST » and remaining watering time will be displayed alternatively
on the screen.
To stop the test press the
key
All manuals and user guides at all-guides.com

Related product manuals