SECTION 4 - CARRIAGE.
Rev BJune 2013
Page 4-10
4.10
The right side rollers will have been set in the factory to
achieve clearance of approximately 3/4 (FIG 7&8) spacing
between the carriage guide frame and the outside of the
guide rails. The left side rollers are spring loaded and you
must back off the 5/16 square headed bolt to allow the
spring to apply roller pressure on the guide rail.
(not exactly as illustrated).
Figure 7. Upper side roller spacing. Looking from
behind the guide rails.
Figure 8. Lower side roller spacing. Looking from
behind the guide rails.
MATERIAL LIST PART #
1. Carriage guide frame AFCUC001
2. Side roller and bracket FMBUC014
3. Lower guide rails *NOTE
4. Lower side roller frame bracket FFBUC018
5. 1/4 N.C. x 2 Allen head bolt PGAGF002