Assemble lower guide rails, base frame, and cross braces.
Sequentially tighten all guide rail and cross brace bolts.
Mount the gear reducer on the mounting base at the top of the guide rail assembly.
Assemble counterweight side channels and install counterweight plates.
Slide the guide frame into place and insert lower nuts and bolts.
Install the carriage walls and ceiling, leaving bolts loose.
Adjust brake adjustment bolts for proper safety engagement and release.
Adjust the slack cable switch to activate when safeties engage.
Install doors and jambs flush with the shaftway interior.
Shows cam configurations for narrow, standard, and wide bi-fold door shafts.
Shows GAL cam configurations for swing doors based on shaft width.
Basic configuration of the over speed governor on the left side of guide rails.
Connect OSG cable to brake linkage and locate safety circuit switch.
Diagrams showing bracket locations for limit switches.
Diagrams showing magnetic position and slack cable switch locations.
Layout of components on the control panel and wiring diagrams.
Diagrams detailing required clearances for carriage and motor.
Assembly drawing for gear box and upper horizontal support.
Assembly drawing for the bi-fold door frame.
Assembly drawing for the manual crank mechanism.
Detailed assembly drawing for the counter weight system.
List of tools needed for the elevator installation process.
List of standard tools to be included in the installer's toolbox.