Fi d b b il & h B il M l
Fi
nne
d
co
pp
er tu
b
e gas
b
o
il
ers
&
water
h
eaters –
B
o
il
er
M
anua
l
27
F
F
Ignition Trial:
1. Once energized, the  ame sense module (FSM) initiates 4 sec-
ond diagnostic cycle before sending 24V ac to the PV terminal
and energizing the ignition transformer.
2.  e  ame failure LED will be lit during the 4 second diagnostic
cycle unless the unit is con gured for CSD-1. When the PV
terminal energizes, the LED will turn o . If the ignition trial
fails, the LED will relight.
3.  e pilot valve and ignition transformer are energized for the
10 second ignition trial. e pilot indicator light illuminates
during this time.
4. If the ignition a empt is unsuccessful, the ignition module will
retry in 5 minutes.
5. Since the staging controller remains powered, it will continue
to stage up for as long as the call for heat exists.  e blower,
pump and power venter will remain for as long as a call for heat
exists.
6. If the second ignition a empt is unsuccessful the gas valves will
lockout, but the blower, pump and power venter will remain
on. To reset the boiler/water heater, take one of the following
steps:
Adjust the high limit down below the point at which the
blower shuts down, then reset the limit to its normal se ing.
Remove power from the boiler/water heater, wait 30 seconds
and re-establish power to the unit.
Main Burner:
1. Once the pilot is proved the MV terminal on (FSM) is energized
sending 24V ac to the main gas valve.
2.  e main gas valve opens via action of K1.
3.  e main burner indicator light illuminates.  e PV terminal
remains energized and the pilot indicator remains on.
Normal Operation
Staging will be controlled from the staging controller.
•  e front control panel separately monitors limit, gas pressure,
water  ow and air  ow.
If staging changes during operation, blowers, pres-sure switches
and gas valves will be switched or turned o as required.
Stage 1 will be on  rst, last and whenever the boiler operates.
For a change from stage 2 to 3 or 3 to 4, 10 second
DOM time delays were added to the pressure switch
switching circuits (TDR2 and TDR3).  e time delays
provide hold states that allow the blowers to reach full
speed and close the high  re pressure switches before
they are energized to con rm proper air  ow.
Demand Satis ed:
1. Stage switch 1 opens, TDR1 de-energizes.
2.
Power is removed from ignition module, blowers and power venter.
3. All indicators (except power) o .
4. Staging controller initiates a pump purge for 20 or more seconds,
depending on the inlet/outlet temperatures and ∆T se ing in
the controller.  e pump then shuts o .
Staging Control Alarms:
1.
Staging control alarms are visible on the controller's LCD screen.
See the staging control documentation for details.
2. A powered alarm contact (2A max @ 24 VAC) is available to
provide an audio or visual indication of faults related only to
staging control operation.  is contact is wired to the junction
box for optional remote indication. Refer to the 4 stage wiring
diagram for tie-ins.
High Limit, Low Water Flow, Low Gas Pressure, High Gas
Pressure, Power Venter Interlock Faults
1. All gas valves, the blowers and power venter will de-energize if
either alarm is tripped.
2.  e manual reset high limit can be reset through a knockout
accessible in the le side jacket panel.
3. Condition indicators are visible on the control panel.
Low Air (Blocked Flue/Air Inlet)
One of two pressure switches will monitor the air ow of each
blower.
Air monitoring will begin at prepurge.
If a low air condition is present on the le side, power will not be
supplied to the module.  e blowers will remain on and the low
air indicator will remain on for as long as a call for heat exists.
If a low air condition is present on the right side, power will not
be supplied to the right gas valve.
A low air indicator for each boiler side is visible on the control
panel.

Other manuals for RBI DOMINATOR Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the RBI DOMINATOR Series and is the answer not in the manual?

RBI DOMINATOR Series Specifications

General IconGeneral
CategoryBoiler
BrandRBI
SeriesDOMINATOR
Fuel TypeGas
ConfigurationFloor-standing
Water ContentVaries by model
DimensionsVaries by model
WeightVaries by model

Related product manuals