Rev 1.0
16
3.7 Crew Instructions
PRE-TRANSFER
ORDER
RESPONSIBLE
ACTIVITY
1
Supervisor
Conduct risk assessment
2
Conduct pre-use check of equipment
3
Conduct passengers and crew briefing
4
Deck crew
Ensure landing areas are clear of obstructions
5
Check passengers are correctly wearing personal
flotation device and any other appropriate PPE
6
Assign passengers to a group and position to
ensure even load distribution within SWL
Table 7 Pre-Transfer Instructions
TRANSFER
ORDER
RESPONSIBLE
ACTIVITY
1
Deck crew
Connect lifting assembly to crane hook. Ensure
positive lock is closed.
2
Route lifting assembly into a safe position
3
Load luggage into Luggage basket
4
When safe signal to passengers to enter
5
Ensure lifting assembly and any taglines are
clear from snagging hazard
6
Signal lift to crane operator.
Table 8 Transfer Instructions
LANDING
ORDER
RESPONSIBLE
ACTIVITY
1
Crane operator
Land carrier on clear landing area
2
Deck crew
If used, beware taglines risks
3
Crane operator
Pay out slack on lifting assembly when carrier
is landed
4
Place hook down-wind of carrier
5
Deck Crew
Route lifting assembly away from exiting
passengers
6
When safe, instruct exit and guide
passengers to a safe area
7
Unload luggage
Table 9 Landing Instructions