5.3 Maintenance
The following inspections and maintenance tasks are recommended at least two
times per year for best controller performance:
Check that the controller is securely mounted in a clean and dry
environment.
Check that the airflow and ventilation around the controller is not blocked.
Clear all dirt or fragments on the heat sink.
Check all the exposed wires to make sure insulation is not damaged for
serious sun exposure, frictional wear, dryness, insects or rats etc.
Maintain or replace the wires if necessary.
Tighten all the terminals. Inspect for loose, broken, or burnt wire
connections.
Check and confirm that the LED digital display is consistent. Pay attention
to any troubleshooting or error indication. Take necessary corrective
action.
Confirm that all the system components are ground connected tightly and
correctly.
Confirm that all the terminals have no corrosion, insulation damaged, high
temperature or burnt/discolored sign, tighten terminal screws to the
suggested torque
Inspect for dirt, insects and corrosion, and clear up.
Check and confirm that lightning arrester is in good condition. Replace a
new one in time to avoid damaging of the controller and other equipment.
Warning: Risk of electric shock! Make sure all the power is turned off
before above operations, and then follow the corresponding inspections
and operations.