EasyManuals Logo

Rheem 96V Series User Manual

Rheem 96V Series
128 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #22 background imageLoading...
Page #22 background image
Field Conversions
22
ST-A1194-30-02
Notes:
Checklist:
__ VERIFY ALL HOSES ARE SECURE AND FULLY SEATED.
_
_ ALL DRAIN PORTS ARE PLUGGED
__ UNIT HAS FORWARD PITCH
__ HEAT TAPE INSTALLED(IF REQUIRED)
__ CONFIRM THAT ALL HOSES ARE FREE OF KINKS
__ CONFIRM ALL HOSES AND OTHER DRAIN PARTS HAVE A
SLOPE IN DIRECTION OF WATER FLOW
__ BOTH WORM DRIVES ON THE HOSE CLAMPS OF THE IDB COUPLING
MUST BE LOCATED ON THE TOP OF THE COUPLING. SEE LOCATION
DETAIL IN THE GENERAL CONVERSION INSTRUCTIONS AT THE
BEGINNING OF THIS SECTION
__ ALL CLAMPS AND COUPLINGS ARE TIGHTENED
__ DOUBLE CHECK DIFFUSER IS INSTALLED IN INTAKE COUPLING

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rheem 96V Series and is the answer not in the manual?

Rheem 96V Series Specifications

General IconGeneral
BrandRheem
Model96V Series
CategoryFurnace
LanguageEnglish

Related product manuals