Taurus-C1 Training
136
Slide 136
Outline of the Installation Procedure (2)
Connect the Main Machine to the Power Source
and turn the Power On.
Keep the covers closed.
Note that developer installation and TD sensor
initialization are done at the factory before
shipping. There is nothing to do with developer
during the installation procedure.
Transfer Toner to the Toner Hoppers: SP3051-
001
Initialize Process Control: SP3020-001
Check that initialization was successful: SP3012-
001
Exit SP Mode and Turn the Power Off
This is an outline of the installation procedure. Important points will be mentioned
in the next few slides. See the service manual for full details.