Do you have a question about the Riello 40 G5 and is the answer not in the manual?
Explains periodic checks of pump pressure operation and necessary actions.
Provides detailed dimensional drawings of the flange and burner.
Details steps for fixing the flange to the boiler using screws and gasket.
Explains how to access internal components like the combustion head for maintenance.
Details the procedure for priming the pump by loosening the vacuum gauge plug.
Instructions for checking the burner shut-down by opening the thermostats.
Details the routing and connection of the electrical cable to the terminal block.
Lists recommended nozzle types and specifies angles for different scenarios.
States factory pump pressure and adjustment for low temperatures.
Explains setting the combustion head based on output and blast tube level.
Details how to adjust the air damper for optimal combustion and smoke number.
Covers correct electrode positioning, pump setting, combustion head, and air damper adjustments.