19
•
Dismantle the throttle
with a number 12
spanner.
•
With a special
screwdriver, remove the
injector, put it down, rinse
it with petrol and blow
out.
•
Reassemble the injector
after you have dried the
sealing gasket on top.
•
Fasten the injector without
forcing it.
•
Carefully reassemble the
throttle by screwing it all the
way on and make sure the
hexagon is flat on the
injector support.
•
Test the operation by performing the procedures in the chapter
"Operation".
FOR ALL OTHER INTERVENTIONS RELATED TO THE GAS CIRCUIT,
PLEASE CONTACT YOUR RIPACK DEALER.
M
AINTENANCE
OF
THE
FITTINGS
:
Lubricate the fittings with "MOLYKOTE
1102 GAS COCK GREASE" or equivalent.
Note: Sealing product NBR.