Installation and Programming Manual 3-35
ZONES: MAINTENANCE (cont’d)
Quick Key Item Explanation
2 9 7 Zone Self Test
(cont’d)
CHOOSING A TESTING SCHEDULE
in Installer Programming, locate:
1)SYSTEM
/ 1)TIME DEFINE / 7)ZONE TEST TIMES
i) when at this display, press [ENTER] to proceed:
ii) press [ENTER] again
iii) at this display, define the time (in 24-Hour format) when the
first test will begin; use the DOWN-arrow (BYP) and/or UP-
arrow (STAT), as required, to reposition the cursor
iv) press [ENTER]
v) press the DOWN-arrow once to obtain this display:
vi) and press [ENTER]
vii) enter the desired interval separating each test (between
01 and 24 hours) and press [ENTER]
viii) press the [.] key to exit
SETTING UP THE UTILITY OUTPUT TO TRIGGER THE NOISE
SOURCE
for background information on Utility Outputs, refer to page 1-4
at the top level of Installer Programming, refer to 3)UTIL
OUTPUT
i) from this display:
ii) press [ENTER]
iii) choose a Utility Output to trigger the noise source (see page 3-
41), by selecting an unused UO number (e.g. UO2);
press [ENTER]
iv) at this display, press [1] to select SYSTEM
TIME DEFINE:
7)Z.TEST TIMES ¤
START TEST AT:
HOUR:00 MIN:00
ZONE TEST TIMES
1)START TST AT:↓
ZONE TEST TIMES
2)Z.TEST PERIOD↑
ZONE TEST PERIOD
PERIOD:10(00-24)
INSTALLER PROG:
3)UTIL OUTPUT ¤
SELECT UO NUMBER
UO=01 (0:1)
UO=02 FOLLOWS:
0)NOTHING ↓
INSTALLER PROG:
2)ZONES ↓