-
60
-
8c-4 REASSEMBLY PROCEDURE
(1) Mount the inlet screen
qq
qq
q on the body.
(2) Mount the inlet needle valve
ww
ww
w, metering lever spring
ee
ee
e, metering lever
rr
rr
r and other related parts.
After mounting these parts, adjust the metering lever
rr
rr
r position at the specified height. Be particu-
larly careful when carrying out this adjustment, because the metering lever height depends on the
model.
(3) Next, mount the metering gasket
tt
tt
t, metering diaphragm
yy
yy
y and cover
uu
uu
u in this order and then
tighten the four cover screws
ii
ii
i.
(4) Mount the high-speed needle
oo
oo
o and the idle needle
!0!0
!0!0
!0, turn them gently clockwise to the fully shut
position and then adjust them to the specified opening by returning them counterclockwise from that
position. Be particularly careful when carrying out this adjustment, because the opening depends on
the model, both for the H and L positions.
(5) Next, mount the pump diaphragm
!1!1
!1!1
!1, pump gasket
!2!2
!2!2
!2 and pump cover
!3!3
!3!3
!3 in this order and then
tighten the pump cover screw
!4!4
!4!4
!4.
Refer to the figure at the Fig. 8-8 for the procedure for mounting the parts of the carburetor.
By the way, when the idle needle
!0!0
!0!0
!0 and the high-speed needle
oo
oo
o require a considerable amount of
adjustment and when large amounts of foreign matter is stuck on the inlet screen
qq
qq
q when the carbu-
retor is disassembled, be sure to clean the interior of the fuel tank and change the tank filter.