6. Power Controller Trusted Power System
28 Issue 11 Rockwell Automation Publication PD-T823X
Figure 12 Power Controller Outline Drawing
6.1. Power Up Sequence
When a Power Controller is connected to more than one Power Shelf, Power Shelves should
have their supplies applied in turn, e.g. power up first Shelf (idents 1-3), followed by Shelf
two (idents 4-6) etc. This ensures that the Power Pack addresses are not duplicated.