EasyManua.ls Logo

Rohde & Schwarz ZNB - Page 596

Rohde & Schwarz ZNB
1498 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GUI Reference
R&S
®
ZNB/ZNBT
596User Manual 1173.9163.02 ─ 54
Measure
Starts the measurement of DUT + Test Fixture at the Active ports.
The display will change to show all the S parameter measurements being made. The
resulting Touchstone file is written to C:\Users\Public\Documents\Rohde-Schwarz\Vna
\Embedding.
Remote command:
CALCulate:FMODel:ISD<Ph_pt>:DUT:MEASure
CALCulate:FMODel:SFD<Ph_pt>:DUT:MEASure
Active
Before starting to Measure, use these checkboxes to indicate the physical ports to
which DUT + test fixture are connected. For single-ended deembedding 2 ports must
be active, for balanced deembedding 4 ports.
Remote command:
CALCulate:FMODel:ISD<Ph_pt>:DUT[:STATe]
CALCulate:FMODel:SFD<Ph_pt>:DUT[:STATe]
6.13.5.4 Save Fixture Model
This section allows you to run the selected deembedding tool to generate the Touch-
stone files for fixture deembedding (and the Touchstone file of the de-embedded DUT).
Figure 6-55: Save Fixture Model section
Offset Embed Softtool

Table of Contents

Other manuals for Rohde & Schwarz ZNB

Related product manuals