4-2
SG2-640/540/300
4
Service
Activities
Installation Checklist
SG2-640/SG2-540/SG2-300 Installation Checklist
Date:
User name: Serial number:
Installation space
□
The space is secured in order to use this machine.
□
Conrm that the included items are all present and accounted for in reference to Setup Guide.
Installation and
preparation
Refer to "Assembly and Ink Filling" to “Network settings" of the Setup Guide and perform the following work.
□
Assembling the stand – mounting the machine
Assembling using the lift bar
Prepare the following items:
[Necessary tool]
Item
6.0 mm hexagonal wrench
Cutter
Included item
1
2