14
Adapter & Hose Installation (see Figs. 11 and 12)
1. Install Pc. (2) with metal hose clamps, on power unit
column side connecting it to the cylinder (1) rst.
2. Install Pc. (3) with plastic hose clamps starting at
opposite column cylinder (1) and working toward the
power unit column. All excess hose should be at bends
& inside overhead assembly. DO NOT try to use optional
column extension mounting holes when attaching hose
clamps. They will NOT work. Use lower set of holes.
3. Install Pc. (4) into power unit.
4. Connect Pc. (2) & Pc. (3) to Tee (4).
1
2
6
4
6
FRONT
Hose runs down
approach side to
cylinder on left column.
Cylinder bleeders
Torque values
15 ft-lbs. (20Nm) Min.
20 ft-lbs. (27Nm) Max.
*
*
*
*
**
##
# #
6
5
3
3
5
1
NOTE: Route Power Unit hose inside columns using slots
provided at column base, Fig. 14. Route Overhead Hose in
column channel on outside of column, Fig. 14. Overhead
hose goes over top end of overhead assembly, Fig. 12 & Fig.
16a & Fig. 16b.
11. Equalizing Cables
A) Refer to Fig. 13 for the general cable arrangement.
First, run a cable end up through the small hole in the
lower tie-off plate. Fig. 15.
B) Push the cable up until the stud is out of the carriage
top opening.
C) Run a nylon insert locknut onto the cable stud so 1/2”
(13mm) of the stud extends out of the locknut.
D) Pull the cable back down, Fig. 15.
ITEM QTY. DESCRIPTION
1 2 Hydraulic Cylinder
2 1 Power Unit Hose
3 1 Overhead Hose
4 1 Branch Tee
5 2 Metal Hose Clips
*6 3/8-16NC x 3/4” lg. Carriage Bolts
*6 3/8”-16NC Flanged Locknuts
6 8 Plastic Hose Clips
#4 3/8-16NC x 3/4” lg. Flanged HHCS
#4 3/8”-16NC Flanged Locknuts
Fig. 11
Fig. 12
1st Cable
2nd Cable
Upper Sheaves
Lower Sheaves
Fig. 13
Fig. 14
Hose Slot and Hose
Attach hose to column
using 3/8"-16NC x 3/4"
Carriage Bolts, Flanged
Locknuts, and Hose Clips
Sheave Cover