EasyManua.ls Logo

Rotary 2000 Series - Equalizer Cable Adjustment and Spacers; Equalizer Cable Adjustment Procedure; Pipe Spacer Lengths

Rotary 2000 Series
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
Upper Cable Tie Off
& 5/8" Nylon Insert
Locknut
Lower Cable Tie Off
& 5/8" Nylon Insert
Locknut
3/4"(19mm)
SCHEDULE 40
steel pipe spacer
for Narrow Bay
and/or Low Ceiling
Provided By Installer
The lengths required for pipe spacers
are as follows (NB = Narrow Bay and
LC = Low Ceiling):
SPOA7NB or LC= 8" (203mm)
SPOA7NB & LC = 16" (406mm)
SPO10LC or SPOA10LC = 8" (203mm)
SPOA10NB = 6” (153mm)
SPOA10NB & LC = 14” (356mm)
Fig. 15
E) Run cable around the lower sheave, then up and around
overhead sheave and across and down to the
opposite
carriage, Fig. 13. Install sheave cover, Fig. 14.
F) Fasten the cable end to the carriage upper tie-off
bracket, Fig. 15. Tighten the locknut enough to apply
light tension to the cable.
G) Repeat procedure for the second cable. Complete lift
assembly. Adjust the tension of both cables during the
nal adjustments in Paragraph 20.
Latch cable runs
along approach
side of overhead
Cable Guide
runs UNDER
hydraulic hose
Attach to extension using
wire tie. Use hole closest
to OUTSIDE edge and on
NON-APPROACH side.
1/4"-20NC x 1" HHCS
and Flanged Locknut
3/8"-16NC x 3/4" HHCS
and Flanged Locknut
3/8"-16NC x 3/4" HHCS
and Flanged Locknut
Fig. 16a
APPROACH
Attach Hose Clamps Here
Attach Latch Cable Conduit
Guide Bracket Here. Always
use two holes on approach
side of extension to attach bracket.
Always put HHCS through hole
closest to center of overhead.
Fig. 16b

Related product manuals