24
Picture 4.7 Raising the mast.
Picture 4.8 Raising into place.
Now the final rig adjustments can be made.
1. Attach the lower shrouds to the mast.
2. Lower the main shrouds in the shroud adjusters to hole 4, this is a good
starting point .
3. Attach the lower shrouds to the forward set of chain points so they are
just slack.
4. Pull on the rig tension cascade firmly, enough so that the rigging is
taught. This should make the lower shrouds go tight. If it does not then