14. Lead the end of the downhaul line through the hole in the downhaul cleat, from
top to bottom, and tie a figure-of-eight knot in the end.
Now the mast is ready to be put in the boat, or ‘stepped’.
3.4 Stepping the Mast
The Mast-Gate Pin
The mast-gate pin is already fitted to your RS QUBA. The pin has a Knurled nut on
the bottom to prevent it from falling out.