EasyManua.ls Logo

RuggedCom RuggedSwitch RS900 Family - Figure 7 - Dielectric Strength Testing

RuggedCom RuggedSwitch RS900 Family
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RS900 Family Installation Guide
2.2.4 Dielectric Strength Testing
Units which are to have dielectric strength testing (HIPOT testing) done in the field must
have the braided ground cable disconnected during the test. This is required in order to
prevent the surge suppression circuitry, which is connected to surge ground, from being
activated.
Figure 7 - Dielectric Strength Testing
2010 RuggedCom Inc. 20 Rev107

Table of Contents

Related product manuals