EasyManua.ls Logo

rulmeca 80LP - Transport and Storage

rulmeca 80LP
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18 DRUM MOTOR INSTALLATION MANUAL 80LP-138LP
TRANSPORT AND STORAGE
General Information
> Remove the packaging.
> Carry out an inspection of the product for transport damage or any missing parts.
> Contact RULMECA in the event of any problems.
Transport
To avoid transport damage and personal
injury, use a lifting device.
> Transport of Drum Motors must be carried out
by authorized personnel only.
> Ensure that the Drum Motor is properly secured
prior to transport.
> Use a lifting rope in accordance with the
maximum weight of the Drum Motor.
• The weight of the Drum Motor can be found
on the data plate or in the catalogue.
> Attach the lifting rope to the shaft ends.
Storage
> Keep the motor in a dry and enclosed/covered
location, protected from direct sunlight.
> Turn the Drum Motor shell 360° every 6 months
to lubricate all internal parts.
In case of a storage period of more than 6 months:
> Carry out a test of the Drum Motor before
operation.
> Properly attach the Drum Motor to a test frame
for a test run.
> Carry out a check of:
the motor winding with an insulation tester,
the winding resistance,
and the thermal protector with a continuity
tester.
> Furthermore, connect the Pulley to the power
supply and carry out a test run for a minimum of
30 min to make sure there are no oil leaks.
Make sure that the body temperature
of the Pulley does not exceed 70 °C.

Related product manuals