5 Taking into operation
BA.GB.12-27409-05-07-FTA-jr
RUTHMANN-Steiger
®
TB270
5-1
5 Taking into operation
Attention!
If faults are determined when putting it into operation,
operation must not be started. Operation may only start
after elimination of the faults.
Note
Apart from the following explanations especially the safety
instructions in chapter 1.2 must be observed.
The Ruthmann-Steiger must be checked for roadworthiness and operating
safety each time before it is put into operation.
5.1 Definition of transport and basic position
Transport and basic position are identical.
Position of the components
Component
Position
Stabilizing jacks
Jack front left
retracted
Jack front right
retracted
Jack rear left
retracted
Jack rear right
retracted
Boom
Turret
centre position
Boom system
in boom rest
Telescope
retracted
Working cage
Door
closed