EasyManua.ls Logo

RUTHMANN Steiger TB270 - Page 107

Default Icon
261 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 Taking into operation
BA.GB.12-27409-05-07-FTA-jr
RUTHMANN-Steiger
®
TB270
5-3
5.2 Measurements before starting a journey
The Operating Instructions of the chassis manufacturer must be observed.
Additional checks before starting the engine:
visually for damage (fissures, deformations, corrosion at carrying
parts, fastening and locking of removable connections, leakages
etc.)
Ruthmann-Steiger in transport position,
Additional checks after switching on the ignition:
The Pilot lamps „Steiger not in transport position“ and „Stabilizing
jacks not in basic position“ on the electrical control panel of the in-
strument panel has to have extinguished.

Related product manuals