EasyManua.ls Logo

ryan 544951J - Initial Setup Procedures; Unpacking and Unit Preparation

Default Icon
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
JR SODCUTTER
SET-UP
SET-UP
To prevent injury, wear eye protection and stand clear whe cutting banding. Banding is under tension and
may snap back when cut.
1. Remove crate top, sides and plastic covering unit. Remove the banding attaching the Jr. Sodcutter to the
pallet.
2. Roll the Jr. Sodcutter off the pallet. The unit can also be driven off the pallet, but rst read the Safety,
Controls, and Operation sections of this manual, then check the oil and add gas.
3. Dispose of pallet, crate, plastic and banding in a responsible manner.

Related product manuals