EasyManua.ls Logo

ryan TCAD 9900 User Manual

ryan TCAD 9900
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
INSTALLATION MANUAL
9900 Series
Models 9900, 9900A and 9900B
Copyright 1998
RYAN INTERNATIONAL CORPORATION Telephone: (614) 885-3303
4800 Evanswood Drive · Columbus, Ohio 43229 Manual Part Number: 32-2301
Revision 4, December 17, 1998
Question and Answer IconNeed help?

Do you have a question about the ryan TCAD 9900 and is the answer not in the manual?

ryan TCAD 9900 Specifications

General IconGeneral
Brandryan
ModelTCAD 9900
CategoryAircrafts
LanguageEnglish

Summary

SECTION I GENERAL INFORMATION

1.2 PRODUCT DESCRIPTION

Details the features and capabilities of the Ryan TCAD 9900 Series models.

SECTION II INSTALLATION

2.3 TRANSPONDER AND ENCODER REQUIREMENTS

Specifies requirements for transponders and altitude encoders for TCAD compatibility.

2.4 SUPPRESSION

Explains the necessity of transponder and DME suppression for TCAD operation.

2.7 ANTENNA PLACEMENT CONSIDERATIONS

Provides guidance on optimal placement of TCAD antennas for performance.

2.8 TRANSPONDER COUPLER

Details the function and installation of the transponder coupler.

2.10 MECHANICAL INSTALLATION OF DISPLAY

Covers the physical mounting procedures for the TCAD display unit.

2.11 MECHANICAL INSTALLATION OF PROCESSOR

Details the process for mechanically installing the TCAD processor unit.

2.12 MECHANICAL INSTALLATION OF TRANSPONDER COUPLER

Describes the mechanical installation of the transponder coupler.

2.13 MECHANICAL INSTALLATION OF ANTENNAS

Provides guidance on the mechanical installation of the TCAD antennas.

SECTION III OPERATION

SECTION IV PERFORMANCE TESTING

4.3 COMPUTER TEST

Details the procedure for testing TCAD computer functions, isolated or in-aircraft.

4.4 RAMP TEST

Describes tests to verify TCAD, transponder, and encoder operation.

4.5 INTERFERENCE CHECK

Outlines checks to ensure interference-free TCAD operation.

4.6 SUPPRESSION CHECK

Verifies the correct connection and operation of TCAD and DME suppression.

SECTION VI INSTALLATION PLANNING AND TROUBLESHOOTING GUIDE

6.4 INSTALLATION IN A SEVERE EMI ENVIRONMENT

Offers advice for installing TCAD in areas with high electromagnetic interference.

6.5 MALFUNCTION INDICATIONS

Lists common TCAD problems and their likely causes and remedies.

Related product manuals