English
24
7
7.5Dose calibration
7
Thevendingmachineisdeliveredwithstandard
calibration values set by the manufacturer.
7
Dosecalibrationcanbeperformedbymeansoftwo
calibration levels:
7
•
remove the cover;
7777777
•
freetheadjustingleverfromtherackandputthe
internaldividerpullingpegintooneofthe4possible
positions inthebasiccoffeequantityarea(7gr-8gr
- 9 gr - 10 gr);
77777
•
movetheadjustingleverintotherackandselectthe
slot corresponding to the dose required.
77777
7.6Coffee Grind Adjustment
7
Turn the ring until the required results are obtained.
77
Afteranycalibrationthreeselectionsarenecessary
before the new setting becomes effective.
7777
7.7First start-up of the vending
machine
7
Supplythevendingmachine(followingtheinstructions
givenpreviously)andplugitintothepowersupply
(see section "Power Grid Connection").
7
Atthispointthemessage"IPERAUTOMATICA"will
appearonthedisplayandtheself-diagnosisphaseis
activatedtocheckthecorrectpositioningofthe
machine devices.
7
Anyfaultsdetectedduringtheself-configurationcycle
arestoredsothatthevendingmachinecandisplay
them at the end of the self diagnostic phase.
7
Carryoutthegrinderadjustmentasindicatedinthe
instructionsatsection"CoffeeGrinderAdjustment"
after refilling the water circuit.
7
7.8Water circuit filling
7
At first VM start-up, the boiler is filled automatically.
7
7.8.1Filling the boiler manually
7
After switchingthe vendingmachine onitis possibleto
fill the boiler by activating the following procedure:
77
Procedure A
7
•
press the P2 key to enter the maintenance menu;
7
•
EntertheMaintenance/Washesmenuandstartthe
automatic washing cycle;
77