EasyManua.ls Logo

SAJ PDM20 series - Page 58

SAJ PDM20 series
59 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PDM20 Series
-57-
4. Three wire 24V sensor wiring diagram
M1 M2 GND +VO AI
2.Set pressure parameters:
P0.38=1
P0.03=10
P0.04=1
P0.05=24
3.Set target pressure:
P0.00=3.0
P0.01=0.3
4.Choose auto-start mode:
P0.14=11
5.Check rotation direction
of pump:
Shortly start pump, check
the direction of pump, if
the pump direction error,
change the pdrameter
P0.02.
6.Observe the effect of
constant pressure:
Observe the effect of
constant pressure, if the
pressure is constant, that is
OK; if the pressure
fluctuations large , please
reference common fault
handling tutorial.
8.Warm tips
a: Water supply system
must be equipped with a
check valve, five way valve
is a kind of check valve.
b: For a new pump,when it
runs without pressure,
emptying is suggested.
PDM20-Three wire 24V sensor wiring diagram
Pressure
transmitter
Type: PT1100
Power: 24VDC
Range: 0-1Mpa
Output: 4-20mA
Power line
red
Singal line
green
Ground line
balck
Black line connected to GND
Red line connected to +VO
Green line connected to AI
Before connecting, check the
voltage between +VO and GND
using a multimeter
1.Installation and wiring:
Connect the power cable
and the sensor cable
according to the diagram.
7.Sleep test:
Close the water outlet, the
drive output frequency will
be reduced until shutdown;
if it can not sleep, please
refer to the common fault
handling tutorial.

Related product manuals