16-62 EB 5573 EN
Appendix A (conguration instructions)
Functions Default Conguration
Parallel pump operation 0
10min
40.0°C
CO4->F06-1
Stop parallel pump operation in the event of a
systemdeviation:0to10min
Flow temperature limit for parallel operation:
20.0to90.0°C
16.3.7 Circulation pump during storage tank charging
WiththesettingCO4->F11-1,thecirculationpump(DHW)continuesoperationaccording
to the programmed time schedule even during storage tank charging. With the setting
CO4->F11-0,thecirculationpumpisswitchedoffassoonasthestoragetankcharging
pump is activated. The circulation pump starts to operate again according to the time sched-
ule when the storage tank charging pump has been switched off again.
Functions Default Conguration
Circulation pump operation during stor-
age tank charging
0 CO4->F11
16.3.8 Priority circuit
In many district heating systems with primary DHW heating, the allotted amount of water
cannot meet DHW heating and heating operation demands when they are required at the
same time. As a result, the capacity required for DHW heating needs to be taken from the
heatingsystemwhengreatheatingloadsoccur;andthis,untilDHWdemandhasbeencon-
cluded. Nevertheless, heating operation is not to be interrupted simply. Only the amount of
energy required for DHW heating is to be deducted. This can be achieved by using the pri-
ority functions: reverse control and set-back operation.
The priority functions (reverse control and priority operation) can be activated for each heat-
ing circuit separately in system Anl 4.5.
Rk1
Rk2
Rk1+Rk2