Installing the air conditioner
Vacuuming, gas leak test and charging additional refrigerant
Air tightness test and vacuuming
Use Nitrogen gas for air tightness test as shown in the illustration.
Nitrogen gas
High pressure sideLow pressure side
Manifold gage
Vacuum
pump
1. Execute air tightness test with nitrogen gas at pressure over 0.2MPa and below 4.1MPa. If you apply pressure at over
4.1MPa, pipes may get damaged. Therefore, apply pressure with pressure regulator and pay attention to the pressure of
the nitrogen.
2. After applying Nitrogen gas, check there's any change of pressure, using a pressure regulator.
3. Check for leakage at connection part and brazed part by using soap water.
4. When there's no leakage, open the manifold gage to discharge nitrogen and connect the vacuum pump to the manifold
gage.
5. Perform vacuuming for over 30minutes by using vacuum pump so that pressure is below -0.1006MPa on the pressure
regulator.
- Use a vacuum pump that is at least 140ℓ/min in capacity and make sure that vacuuming timing must be longer when
piping gets longer.
- Pressure will not drop even after 5minutes of vacuuming when there's moisture within the pipe. In this case, execute
nitrogen blowing again before executing vacuuming.
Before vacuuming
Changes in pressure gage after 5 minutes of vacuuming
When there's moisture When there is no moisture
0
0
30
76
35
˚
F
0
0
30
76
35
˚
F
0
0
30
76
35
˚
F
ENGLISH-56
PAC MIRAGE Saudi_IBIM_EN_CS6_DB68-04872A-05.indd 56 2016-08-08 오전 11:38:39