29
ENGLISH
• Install the insulation not to be get wider and use adhesive on the connection part of it to prevent moisture
entering.
• Bind the refrigerant pipe with insulation tape if it is exposed to outside sunlight. (When binding the pipe with
finishing tape, be careful not to reduce the thickness of the insulation.)
• Install the refrigerant pipe respecting that the insulation does not get thinner on the bent part or hanger of pipe.
• When the thickness of insulation is reduced, supplement the reduced thickness with additional insulation.
Insulation for
refrigerant pipe
a x 3
Hanger
Additional
insulation
a
CAUTION
Insulating the header joint
Fasten the header joint using a cable tie and cover the connected part.
Insulate the header joint and the brazing part and wrap the connected part with an
adhesive insulation tape to prevent dew formation.
Insulation
Adhesive insulation
tape
Insulation for the
refrigerant pipe
Insulation for the
header joint
Insulation after brazing a stopper
Adhesive insulation tape
Fix the header joint with a hanger after insulating it.
AM0@@FXMDCH_IM_EN_03408A(1).indd 29 2013-03-04 오후 4:28:24