5-5. Checking and Testing Operations
●
To complete the installation, perform the following checks and tests to ensure that the air conditioner is operating
correctly.
■
PREMIUM
1. Review all the following elements in the installation:
◆ Installation site strength
◆ Piping connection tightness to detect any gas leakages
◆ Connection wiring
◆ Heat-resistant insulation of the piping
◆ Drainage
◆ Earthing wire connection
◆ Correct operations (follow the steps below)
2. Press the On/Off button.
3. Press the button.
4. Air flow direction
◆ Press the button and check that the air flow blades work properly.
Checking and Testing Operations
Result
◆ The indicator lights on the indoor unit flash at half-second intervals.
◆ While the indoor unit opens, the indoor unit fan runs to start.
Result
◆ If you press the button several times, you can choose the type
you want.