EasyManua.ls Logo

Samsung U*H75 SERIES - Tidying up the Connected Cables (U32 H850 UM*)

Samsung U*H75 SERIES
57 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
31
Tidying Up the Connected Cables (U32H850UM*)
1
2
3
4
5
Stand assembly is complete. Rotate the machine to the highest
vertical position.
Connect the corresponding cables. Arrange the cables against the bend
tendency of the cables and pull the
cables out of the COVER-REAR SUB
grooves.
Cover the COVER-REAR SUB.
When you attach the COVER-REAR
SUB, please aim six ribs of the COVER-
REAR SUB to the bottom holes of the
COVER-REAR at first.
6
7 8 9
10
Open the COVER-STAND NECK LEFT,
and rotate the open part at the
bottom.
Place the corresponding cables into
the stand-neck holder. Do not stretch
the line. Three cables in one holder is
recommended.
Cover the COVER-STAND NECK LEFT. Rotate the machine to the horizontal
position.
Arrange the external cables.

Table of Contents

Related product manuals