Do you have a question about the S&C Alduti-Rupter and is the answer not in the manual?
Defines the qualifications required for personnel involved in installation, operation, and maintenance.
Emphasizes the importance of thoroughly reading the instruction sheet and related materials before proceeding.
Instructs users to keep the instruction sheet as a permanent part of the product for future reference.
Specifies that the equipment is intended for specific applications within its rated parameters.
Details the standard warranty conditions and obligations for purchasers of the switch.
Outlines conditions that affect the standard warranty, such as using non-S&C operators.
Explains the meaning and importance of DANGER, WARNING, CAUTION, and NOTICE safety alert messages.
Provides guidance on seeking assistance and reinforces the need to follow all safety instructions.
Details how to obtain replacement instruction sheets and labels, and the importance of keeping labels intact.
Identifies the locations of safety labels (A, B, C, D) on the equipment and provides reorder information.
Provides procedures for inspecting the shipment for visible or concealed loss and damage.
Instructs users to check the bill of materials against the shipment and lists included components for standard arrangements.
Details safe handling procedures for the switch pole-units, emphasizing proper lifting and avoiding damage.
Provides instructions for mounting the switch to a wood structure, including fastener requirements.
Covers cutting operating pipes to length before installation, referring to erection drawings.
Outlines the initial steps for uncrating switch poles and bell-crank bases, and protecting bearings.
Details how to attach pipe couplings to the toggle mechanism of each switch pole, using spacers as needed.
Explains how to attach the bell-crank to its base or bracket, including linkage connections.
Provides critical warnings against lifting the switch by live parts to prevent damage and electrical shock.
Details the proper installation of pipe couplings using piercing set screws to ensure secure connections.
Guides the installation of pipe sections connecting the switch poles and the bell-crank.
Describes the installation of the vertical operating pipe section, particularly the threaded end.
Covers mounting the operating handle assembly and installing the lowest vertical operating-pipe section.
Details steps to remove ties and studs, and slowly operate the switch to check for alignment issues.
Explains the attachment and setup of the key interlock group for proper switch operation sequencing.
Guides the user through slowly opening and closing the switch to verify proper alignment and contact closure.
Provides procedures for connecting high-voltage conductors using aluminum-alloy body connectors.
Details the safe procedure for operating the switch, including removing padlocks and swinging the handle rapidly.