16 S&C Instruction Sheet 695-510
Operation
STEP 6. Repair the fault in accordance with your company’s
operating procedures and rules.
STEP 7. When you are ready to re-energize the circuit, ro-
tate the manual operating handle clockwise to
close the fault interrupter. See Figure 25.
(a) (b)
Figure 25. Closing the fault interrupter: (a) vault-mounted style
(b) pad-mounted style.
STEP 8. Check the POSITION indicators to conrm the
fault interrupter is closed. See Figure26.
Figure 26. The POSITION indicator after the fault interrupter
has been closed.
STEP 9. Conrm the position of the isolating disconnect
using the large viewing window. See Figure 27.
Figure 27. The isolating disconnect after the fault interrupter
has been closed.
STEP 10. Return the manual operating handle to its storage
location, taking care to position the tether out of
the way.