EasyManua.ls Logo

Santint S5 - Maintenance of the Equipment; Maintenance Schedule

Santint S5
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Santint
Automatic Shaker V1.0 8
Attention:
1. No idling and/or overloaded running!
2. Press down the emergency stop button immediately in case there is any abnormal noise while
shaking. The machine shall not be restarted until the issue is solved.
3. Press down the emergency stop button if there is any issue or the machine is locked while
initializing or clamping. Then re-initialize the machine.
4. Disconnect the power supply prior to cleaning.
7. Maintenance of the equipment
Daily maintenance shall be done to optimize the machine performance.
1) Only authorized personnel are allowed to dismantle the machine.
2) Lubricate the guide pillar in three months. Lubricate the two guide screws with lithium grease
in six months (Fig. 7.1).
3) Lubricate the positions shown in Fig. 7.2 with lithium grease yearly.
4) Any issue shall be solved timely!
Fig. 6.4
Fig. 6.5
Bottom Edge
Step Surface
Fig. 7.1
Add Engine Oil
Add Lithium Grease
Fig. 7.2
Add Lithium
Grease