EasyManua.ls Logo

Sapling SBL Series - Page 12

Sapling SBL Series
63 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Wall Mounted Clock Mechanical Installation
12
The Sapling Company, Inc.
670 Louis Drive
Warminster, PA 18974
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
6F
6D
7
6E
6E) Use a pencil to trace the holes beneath each
keyhole onto the wall as shown in the below image.
Take the clock housing off the wall, drill holes at
the marked locations, and add another two wall
anchors.
6F) Place the housing back on the wall in order
to screw a second pair of #8 screws through the
bottom holes and secure them in the remaining two
wall anchors. This is to fixate the clock housing to
the wall.
7) Run power wires through the large hole in the
back of the housing. Secure the wires by passing
them through the wire clamp. The wire clamp is
mounted in the clock housing and can be opened
by using a Phillips head screwdriver.
6D) Use the keyholes in the back of the housing to
hang the clock onto the screws.
wire clamp

Related product manuals