EasyManua.ls Logo

Saturn 125 - Section 5: Metering Pump Priming

Saturn 125
114 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operator's Manual: Models Saturn™ 140 & Saturn™ 230
5-1
SECTION 5: METERING PUMP PRIMING
Understanding Metering Pump Priming
Preparing your Clean Burn furnace for operation begins with priming the metering pump. The
procedures in this section must be performed in sequence without interruption to properly prime the
pump.
Required Tools and Materials
The following tools and materials are required for oil pump priming and should be gathered before starting any
procedures:
3/8" open-end wrench
5/8" open-end wrench
Rags
Two containers (minimum one-gallon)
Permatex #2 non-hardening gasket sealer
Adjustable Wrench
Pipe Wrench

Table of Contents