5 FUNCTIONING AND USE COD: 100M12/24.B.2021
EN
THE PRESENT MANUAL BELONGS TO - Schenker Italia - ALL RIGHTS RESERVED
30
4. Close the depressurization valve. The system
starts going under pressure and the fresh water
production begins. Check the working pressure
of the unit is correct (7,58,5 bar).
5.After a while push FLUSHING in order to flush
the unit before stopping it.
Then the unit will stop after about 1 minute.
The procedure lasts about 3 minutes, and it can be stopped at any time pushing STOP. After completed the
procedure the system is ready to start normally.
5.3 Normal operating procedure
Preliminary checks:
1. Reset valve closed (lever orthogonal to the body valve) and the positioner completely unscrewed.
2. Depressurization valve closed and grey valve on the active carbon filter open.
5.3.1 Normal operating procedure without final flushing
1. Push ON/OFF to start the watermaker.
2. Push ON/OFF to stop the watermaker.