Manual Version 19 / 01-2019 II Page 42 of 44
SF2 ECCR OPERATION MANUAL
12. Attachment
11.1 Checklist
Check all cylinders for content and pressure (O2,
Diluent, Argon, Stages
OPV closed, soda lime checked and installed
Calibration (if necessary)
QD-connections 1+2+3 shut, Pony clamps closed,
all hoses tight
Controller switch on Loop breathing
O2 cylinder open Solenoid / Shut-off check
Solenoid is firing oxygen O2 MAV / Shut-
off check Pressure check closing O2
cylinder
Switch Setpoint to 0.19, Breathe empty loop
Diluent Tank open ADV / Shut-off check
DIL MAV / Shut-off check Wing Inflator
Pressure check closing DIL Tank
Check controller settings (plan, gases, battery,
functions
Equipment check (Light, SMB, Mask etc.)
Open cylinders, switch on Controller, Inflator
connected
pO2 > 0,7 Breath from Loop