5.0
Assembly/Installation
BW
Ausgabe
issue
A / 23.01.07
Dokument
document
OM.INS.08e
Blatt
sheet
2 (2)
5.5 Energy supply to the seepex pump
DANGER
Supply voltage and power frequency
Death or serious injury will result.
! Heed type plate on the pump.
! Pay attention to manufacturer’s directions (Chapter 14.0).
! Pay attention to safety regulations.
5.6 Pipe work
5.6.1 Suction and pressure connection
• Refer to the dimension drawing for the position, nominal pipe size and norm.
• Heed rotational direction/direction of flow.
5.6.2 Dimensioning of pipe work
• Adhere to specifications regarding pressure in the pressure or suction connection.
• Heed technical data (Chapter 3.0).
• Nominal pipe size of suction pipe = nominal pipe size of suction connection of pumps
5.6.3 Residue-free pipe work
NOTICE
Damage to property through assembly residue
No claims under guarantee if violated.
! Keep all pipe work free of foreign objects.
! Remove weld spatters, screws, steel chips etc.
5.6.4 Tension-free mounting
! Assemble pipe work and other components in a tension-free manner.
11