3 LEM022SJ 2015 V01
Never break the seals and open the front cover as this might influence the
functionality of the meter, and will be avoid any warranty.
Do not drop, or allow physical impact to the meter as there are high precision
components inside that may break or render the meter measure accurately.
Exclusion of liability
We have checked the contents of this publication and every effort has been made
to ensure that the descriptions are as accurate as possible.
However, deviations from the description cannot be completely ruled out, so that
no liability can be accepted for any errors or omissions contained in the
information given. The data in this manual are checked regularly and the
necessary corrections are included in subsequent editions. We are grateful for
any improvements that you care to suggest.
Copyright
Copyright (c) 2015 SEP EUROPE All rights Reserved.
It is prohibited to pass on or copy this document or to use or disclose its contents
without our express permission. Any duplication is a violation of the law and
subject to criminal and civil penalties. All rights reserved, particularly in the event
of a patent award or utility model registration.
Registered trademarks
SEP EUROPE is registered trademark of Schotman Elektro BV.
1.2 Foreword
Thank you for purchasing the LEM022SJ DIN rail three phase four wire energy
meter. The LEM022SJ energy meter is an advanced type electronic kWh meter
available at the market. With the our product range we have introduced a large
scale of energy meters on the market suitable for 110VAC to 400VAC (50 or
60Hz).
Although we produce the LEM022SJ meter according to IEC 62053-21 and our
accurate quality inspection there might always be a possibility that your product
shows a fault or failure for which we do apologize. Under normal conditions your
product should give you years of benefit and pleasure. In case there is problem
with the energy meter you should contact your dealer immediately. All energy
meters are sealed with a special seal. Once this seal is broken there is no
possibility to claim (for) warranty. Therefore NEVER open an energy meter or
break the seal of the energy meter. The warranty time is 12 months, after
purchase, and only valid for construction faults.