EasyManua.ls Logo

SERV-WARE SGR-6B-24RG - Installation

Default Icon
14 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
www.servware.com
800•7685953
Service, Installation & Care Manual
5
INSTALLATION
7. A pressure regulator must be installed with this unit. Ensure that the regulator type is in agreement
with the rating plate gas supply. Regulator must be upright after installation. If regulator is not level
during operation, performance problems may result.
8. After connecting the appliance to the gas system, check for leaks at joints and pipe ttings; to do
so, use soapy water or a specic leak detector (spray).
9. Check the gas supply pressure after installation.
10. Gas supply pressure can be measured with a liquid-lled pressure gauge (e.g. a U-shaped
pressure gauge, minimum scale division 0.1mbar) or a digital gauge. Procedure as follows:
Ensure gas is turned off
Remove the panel and unscrew the screw on the pressure port
Place the pressure gauge
Start up the appliance by following the instructions in this owners manual
Check supply pressure. Pressure must agree with rating plate requirement when the unit is in
full operation
After the check, turn off gas and remove the pressure gauge
Replace the sealing screw
OPERATING INSTRUCTIONS AND CONTROLS
When turning on for the rst time please be advised that it might take a little longer to ignite due to
the air existing in the pipe.
IF UNIT HAS GRIDDLE TOP/GRIDDLE + Broiler:
11. Grease collects are packaged in oven for transport, remove from oven.
12. Place grease collector in the opening position. Ensure that grease collector moves freely and is
properly positioned beneath griddle grease chute.

Related product manuals