WOOD BOILER INSTRUCTIONS Page 4 Copyright © 2011 Seton Wood Boilers all rights reserved
INDEX
SUBJECT PAGE
PARTS IDENTIFICATION 8-9
BOILER DESCRIPTION AND INSTALLATION OPTIONS 11-20
BOILER LOCATION 14-20
CHIMNEY MAINTENANCE 15-21
CHIMNEY CONNECTIONS 18-21
MAINTENANCE 65
WARNINGS 22
FUELS AND LOADING 23-25
LIMIT CONTROLS 25-30
POWER FAILURES 25
WIRING 26-29
BACKUP POWER 25
BOILER BUILDING 62-63
PLUMBING ARRANGEMENTS 31-54
TROUBLE SHOOTING 66
PLUMBING TO REMOVE AIR 47
UNDERGROUND 56-57
OFF GRID HEATING 64
MAINTENANCE 59-65
WARRANTEE 58
NOTE: it is possible for the draft tubes to change position during shipping.
Looking through the draft tubes with the draft open with a light will tell if they are sticking into
the refractory. Reach in through the exhaust outlet and check to see that they are pushed into
the holes in the refractory.