EasyManua.ls Logo

SGS SC6H - PREPARATION FOR STARTING - POWER CONNECTION; Initial Power Connection; Break-in Procedure

SGS SC6H
11 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PAGE 9
PAGE 8
ASSEMBLY
Check all nuts and bolts. Make
sure all loosened parts are
tightened before starting.
Remove the white travel plug
and attach the air filter, tighten-
ing hand tight only.
BEFORE USE
1. Ensure the power is OFF
by pushing in the power
switch.
PREPARATION FOR STARTING
2. Push in switch to OFF
position, and plug in power
cord at the wall.
3. Pull up the red power switch
and run compressor unit for
30 minutes to break in the
pump parts.
WWW.SGS-ENGINEERING.COM

Related product manuals