EasyManua.ls Logo

Sharp 1118H

Sharp 1118H
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
Q.) QUICK-ACTING TOOL POST COMPOUND SLIDE ASSEMBLY
The compound slide has a quick-acting tool post, at the start of threading cut, place the
ball-handle “H” (Figure 27) of the quick-acting tool post toward the workpiece, at the end of
the threading cut, the threading tool is instantly cleared from the work by hand operated,
handle “H”, for the return of the carriage to the next cut, the ball-handle lever actuating the
tool post slide feed screw. Operate above procedure repeatedly until the threaded work
piece is completed. Each graduation of the indicated ring “C” (Figure 27) is 0.02mm (0.001)
on diameter.
CAUTION
THE BALL-HANDLE LEVER OF THE QUICK-ACTING TOOL
POST MUST BE MOVED TOWARD OPERATOR AT THE
END OF THE THREADING CUT.
Figure 27-Cross Slide Indicated Ring and
Quick Acting
H
C

Related product manuals