EasyManua.ls Logo

Sharp LC-70EQ10U - Precautions for Assembly (LC-60;70 EQ10 U;SQ10 U,15 U,17 U)

Sharp LC-70EQ10U
182 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LC-60/70EQ10U,SQ10U/15U/17U,TQ15U,UQ17U
4 – 14
[4] Precautions for assembly (LC-60/70EQ10U/SQ10U,15U,17U)
1. Points to be checked and precautions when servicing the unit
Mount the main PWB Ass’y on the backlight chassis and check that the EMI-prevention parts are not peeled and twisted from the access holes. (The
EMI-prevention parts, conductive nonwoven fabric gaskets, must be seen from the access holes.)
[Countermeasure]
Attach the conductive nonwoven fabric gaskets on the shielded case on the main PWB.
LC-60EQ10U/SQ10U,15U,17U
Back side
(1) Prepare ***
LAN GKD145WJFW
TE RM ANG SIDE
(2) Stick ***
PSPA Z C6 90WJZ Z
CONDUCTR:8x 255
Positioni ng
Posit io ning
Back side
Positioning
Pos itionin g
(1) Prepare ***
LAN GKD146WJFW
TE RM ANG BOTTOM
(2) Stick ***
PSPA ZC691 WJZZ
CONDUCTR:8x180

Table of Contents

Other manuals for Sharp LC-70EQ10U

Related product manuals