EasyManua.ls Logo

Sharp SM-SX100 - Page 23

Sharp SM-SX100
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SM-SX100
– 23 –
Figure 23-2
Figure 23-1
CNP102
Core mounting and line process illustration
Before installing the core process hardware, attach the
core to the lead line from the front panel.
Pass the nylon band through the hole of the core process
hardware, and fasten the core.
(The head of the nylon bond must not be positioned on
the upper side.)
(Take care for the front and rear sides of the core process
hardware.)
After the process, install the core process hardware.
Bundle CNP102 (3P) on the core process
hardware with nylon band.
Process the lead line on the chassis side.
Don't direct the head of the nylon band upward.
Pull up CNS902 which is passed
under, and insert it into CMP807.
Insert CNS803 to CNP803.
Only CNS902 inserted to CNP697
is processed with the edge saddle
and clamper.
Process CNS906 from the front panel
with the edge saddle of Area A, and
insert it into CNP804.
Since CNS902 is thick, don't process it with the clamper
of Area B, and bundle it on CNS906 and CNS905 with
nylon band (X2). Don't direct the head of the nylon band
upward.
Process CNS906 and CNS905 on the clamper of Area B.
(CNP807)
(CNP803)
Core Process
Bracket
Nylon
Band
A
B
B
B

Related product manuals