EasyManua.ls Logo

Sicor MR21 - Page 23

Default Icon
38 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AC MUM0096 rev. 07 - 22 -
MR21
IMPORTANT
When installing the li, do not operate the winch for long periods at low speed.
When the winch operates for long periods at low speed, the machine supports are not
lubricated properly and may seize up unexpectedly.
To ensure proper lubricaon, always start the winch at normal operang speed each me work is begun
and then run at high speed every half hour.
START-UP/SHUT-DOWN
The customer is responsible for the procedures, instrucons and wiring diagrams for the start-up and
shut-down of the winch.
NEVER USE THE WINCH FOR PERFORMANCES ABOVE THOSE INDICATED IN THE TECHNICAL
CATALOGUE.
15. DISPOSAL OF THE WINCH AT THE END OF ITS SERVICE LIFE
Drain the machine of its lubricang oil and then:
- Deliver the oil to a company that is authorised to dispose of it.
- Deliver the winch to a company authorised to recycle ferrous materials.

Related product manuals