EasyManua.ls Logo

Siemens iQ700 HS958GE 1B Series - Attaching Pull-out Rail

Siemens iQ700 HS958GE 1B Series
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rails en
39
1.
Push on the side of the tab marked PUSH behind
the rail, and push the rail to the rear.
2.
Press and hold PUSH and swing the rail out-
wards until the front retainer is detached.
a
3.
Pull the rail out towards the front.
4.
Remove the pull-out rail.
5.
Clean the pull-out rail.
→"Cleaning products", Page27
Note:
Further information:
25.4 Attaching the pull-out rail
Note:The pull-out rails only fit on the right or left. Make
sure when you fit them that you can pull them out to-
wards the front.
1.
Guide the pull-out rail with the rear retainer from
below behind the two guide rods for the required
shelf position and keep it horizontal.
2.
Guide the rail lengthways to the rear to the guide
rods, and slide both retainers onto each lower rod.
In doing so, use the rear retainer to grip the ver-
tical rod.
3.
Press and hold PUSH and swing the pull-out rail
inwards until the retainer is attached in the
lower rod.
a

Table of Contents

Related product manuals